Boundary
Creek
Ducks Unlimited, Inc.
The
Boundary Creek Diversion Structure Project involved the evaluation,
design and construction of a 20 cfs diversion structure for wetlands
enhancement at the Boundary Creek WRP near the Idaho Canadian Border.
The project involved participation from Ducks Unlimited, Idaho Fish
and Wildlife and the Natural Resource Conservation Service. Ducks
Unlimited retained CES to design and build a fish screen and diversion
structure acceptable by regulatory agencies.
The water
delivered by the structures had to meet the approved water right
while maintaining fish passage during widely varying flows. The
structure is an innovative V-weir design with no moving parts. The
project also included a water delivery system with flushing control
and flow measurement. CES provided Ducks Unlimited with a complete
design-build package including regulatory negotiation and approval,
preliminary and detailed structure design, structure construction
and construction management and final project record documents.
CES has
also completed other projects for Ducks Unlimited, Inc. and is currently
working for Ducks Unlimited to design three pool and chute fish
ladder check structures at the Ladd Marsh Wildlife Refuge near La
Grande, Oregon.
Blitzen
River Fish Habitat Restoration
Oregon Fish and Wildlife Service
CES
is designing improved fish habitat for a three-mile reach of the
Blitzen River on the Malheur Refuge. This river is incised into
deep silts and clays and has been extensively modified by channel
straightening. CES is designing a stable system that improves fish
habitat as well as continuing to meet the refuge purposes and goals.
|